I couldn't get these do download on facebook. So I am putting them on here first. Besides some of you dont have a facebook account. The floor cost $132.00 and took about an 1hour and half to lay. This does not include pulling up the quater road and the old floor. The floor looks awesome. The doors were also repainted which cost roughly 6.88 for the 2 cans of spray paint. The paint was $5.00 for the Behr paint which matches the computer rooms color. I did have to purchase more primer $19.00. So for less than $200 we have a new looking bathroom.